Port St Joe Elementary School

PSJ Elementary School Cafeteria project included a 5,000 SF addition, the demolition and renovation of the existing kitchen area, a new kitchen hood and a new walk‐in cooler/freezer/dry storage area. Also included is a new HVAC system to service this area specifically. Cafeteria work also included removal of an existing demising partition, new paint, new flooring, new air distribution ductwork, new lighting throughout and a new audio/visual system. This work was part of a dual contract which included locker room renovations at Port St. Joe High School.

Total cost of Construction for Port St. Joe Elementary School and Port St. Joe High School: $3,300,000.00

Both Projects Were Completed in 2013

Change Portfolio

Discuss Your Next Project

Your Name (required)

Your Email (required)

Subject

Your Message

captcha
Enter this code so we know you're human

Special Thanks

VBA-LOGOWebLarge.fw

All Images, Designs & Plan Sheets Copyright ©2014 VBA Design, Inc.

Portions Copyright ©2014, Bayne Collins, AIA

Portions Copyright ©2014, Victoria Williams, AIA, LEED AP BD+C

Website Implementation and Project Management:

ABT-LOGO-Footer.fw

Christine James, ABT Media & Marketing