ARCHITECTURE | PLANNING | INTERIOR DESIGN

Designing A Better Experience

SHERMAN BUILDING BOARD ROOM ANNEX
June 12, 2019
THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS RENOVATION
June 12, 2019

Bennigan's Panama City Mall

This newly installed restaurant includes all new equipment, sealing existing floor tile, new base, new FRP placed over existing in kitchen areas, new ceiling tire and painting metal ceiling tile, new swinging doors to kitchen, reconfigure drop header and booths in dining area, designate waiting area and reconfigure hostess area walls, repaint ceiling, replace fixture seals/faucets in restrooms, refinish front doors, glass and hardware, include door to new patio area, new exterior roof, stem wall and glass enclosure doors, designate brick veneer on top wainscot finish, reconfigure bar seating to omit booths and include high top tables, and designate new water heater.

CONSTRUCTION COMPLETION: 2013

TOTAL GROSS SQUARE FOOTAGE: 4,589